Foyle Food Group, Abattoir, Melton Mowbray – On going

October 2012: What began as an enquiry from the website from Foyle Food Group has now seen the development of a three phase project at the groups Melton Mowbray site. Foyle Foods acquired the site with a view to cutting running costs. The aim of the project is to decommission the currently hired and expensive steam generator which currently supplies all the hot water for the steam plant at the abattoir. The challenge for this project is the guarantee of a continuous rate of hot water at 85 degrees. The hot water requirements for the site are as follows:

  • 85 Degrees for the Gut Room.
  • 60 Degrees for washing down.
  • 45 Degrees for showers and Taps.

Foyle Foods AbattoirePhase 1: November 2012, Wheildons installed two commercial ACV units to provide the continuous hot flow rates as above. Temperatures of 60 and 45 degrees were achieved for the washing down, showers and taps. However, the demand for a continuous flow of hot water at 85 degrees, were not being achieved.

It was soon apparent that the two ACV units that were commissioned to do this, based on their statistics to deliver this rate of hot water could not keep up with the current demand for continuous hot water at 85 degrees. Troubleshooting meetings between the parties were arranged to overcome this obstacle. The outcomes were discussed:

  • The Installation of 2 ACV units would not produce the desired 85 degrees continuous flow, in fact it would require 4 ACV units.
  • Water flow restrictors to be installed to reduce the amount of water currently being used and reduce water wastage.
  • The installation of a tripe machine and its requirements need to be considered.
  • The current return rate of hot water around the plant was too slow due to small pipework, this meant that the temp of the water returning to the ACV units were lower than the required temp return rate to produce a continuous flow rate of 85 degrees.
  • Foyle Foods AbbatoireThe pipe work in the abattoir needs to be increased in size to accommodate this and the pipework also needs to be insulated.
  • A ‘tank in tank’ hot water storage tank is to be installed to utilize the currently wasted energy generated from the re-fridgeration units. The hot water storage will form a pre-heat that will supply the ACV units. This will make the plant more efficient.
  • The work needs to be carried out with minimal disruption to the site and downtime kept to a minimum.
  • The allocation of budgets restricted the amount of work that could be done and when.

Following this meeting in February 2013, Wheildons were commissioned to carry out the installation of a further two ACV units. Increase the size of the pipework in the abattoir to aid a quicker return rate of hot water, implement the use of water flow restrictors at key points to reduce the amount of water currently being used until the new sterilization equipment is installed and install the hot water storage tank.

Foyle Foods are going to replace the roof at the abattoir in March, this will require a shut down period of one week, during this time the pipe work will be upgraded. Foyle will supply the hot water storage tank and insulate the pipe work themselves to reduce costs.

Foyle Foods Abattoire

This work would be carried out in a further two phases, scheduled for February and March 2013.

Phase 2: 12th February 2013: This week Wheildons are back in Melton Mowbray for the Foyle Group. Wheildons will be installing two more ACV units & plant, thus completing phase two of the project.

Phase 3: March 2013: Factory will be shut down for the replacement roof and pipework increase.

To be continued.

MagnaClean Professional

MagnaClean Professional

Wheildons is able to supply and install MagnaClean, but what is it? MagnaClean Professional is a proven technology to provide protection for your central heating system. It can be used in both new and old systems and has been setting … Continue reading

Dimplex SmartRad

Dimplex SmartRad

Wheildons is always looking forward and using new and exciting technology. Things such as the new SmartRad from Dimplex Renewables. The Dimplex SmartRad has been created to set a new standard for the way we think about heating. It uses … Continue reading

Holiday House Oil Boiler Installation

Client: Tod Coates
Client Location: Ambleside
Date: December 2012
Project Undertaken: Oil Boiler Installation for Tarn House Holidays

Testimonial:

We are very happy with the service we have received and the boiler has worked perfectly to date

Regards,

Tod Coates

Baxi Boiler Problems

Client: Pat Thompson
Client Location: High Bentham
Date: January 2013
Project Undertaken: Baxi Boiler Problems

Testimonial:

Thank you very much for looking after us over the Christmas period. Your service is excellent and very much appreciated. Best wishes for 2013

Thanks

Pat

Continue reading

Cottage Plumbing and Heating

Client: Richard & Anna Greenhalgh
Client Location: Austwick and Giggleswick
Date: Various
Project Undertaken: Re-plumbing and gas/oil heating installation work

Testimonial:

We have now undertaken two total house renovations in the last 10 years in Austwick and Giggleswick and working through Roger, his trades people have undertaken the total re-plumbing and gas/oil heating installation work. On the most recent renovation, they installed hot water solar panels which are proving excellent as well as the underfloor heating. Their work is to a consistently high standard and we enjoy working with them. They also do all the routine plumbing and gas heating work for our holiday cottage in Giggleswick and it is pleasing to know that they will respond at short notice.

Thanks

Richard & Anna Greenhalgh

Biomass Heating Course – Passed

Biomass Wood BPEC

We have just qualified for the installation of Biomass Wood burning heating systems. Last week two of the boys attended the BPEC certified course and passed with flying colours. The BPEC Biomass certificate is industry recognised under the Micro-Generation Scheme … Continue reading

Abattoir, Melton Mowbray

Foyle Food Group

This week we have begun a new and exciting project for the Foyle Food Group at their Melton Mowbray site. Two of our teams are staying on location and working around the clock to deliver this project on time and … Continue reading

More training, more skills

More Training for Wheildons employees this month. At Wheildons we believe it is important to continually develop the knowledge and skill of our employees. This month we have selected two employees to attend a BPEC Certified Biomass Heating Systems course, … Continue reading

Quick Boiler Boys

Client: Peter James
Client Location: Eldroth
Date: November 2012
Project Undertaken: Boiler Repair

Testimonial:

Thanks again for turning out so quickly and getting our heating back on the same day.

Much Appreciated.

Peter James

Continue reading